It was a cold winter so not much work was done. Therefore the spring has been hectic and I have been way behind on the planned projects. Things that need to be done before summer are:

* Route air from the Ebesprecher heater to the front cabin (where we sleep).
* Repair deck and find new stanchion-feet (due to German cruising sailor…)
* Mount new stanchion-feet and bend stations to the correct angle.
* New winches (ST) for the headsail.
* Solarpanel.

And then there is the usual work, and then some…